Today, I am going to discuss about a basic Standard BW/BI Project Dataflows which you can consider as a starting base of a BW/BI project. In the last blog the ADSO concept will help here.
1.BW 7.5 on HANA Basic Dataflow –
In this design we followed Queued delta Mechanism in CC side for Delta update. Design your BW/BI project consider the below as a base –
2.BW4/HANA 2.0 Basic Dataflow –
In this design we followed Queued delta Mechanism in CC side for Delta update. Design your BW/BI project consider the below as a base –
Hope this will help. In the next blog will discuss about BW migration pre and post steps need to consider as a BW/BI consultant.
Original Article:
https://blogs.sap.com/2023/03/19/a-standard-bw-on-hana-7.5bw4-hana-project-dataflow-to-begin-for-your-project/